Table of Contents

The pics in this log have been resized and compressed for reasonable download and display
times.  Log pics are to illustrate each step in our renovation and represent only a fraction of all
pics taken of a particular step on a specific day.  If you have a need for more detailed pics of any
particular step in this log, please contact us and we'll forward a full resolution pic package.

2015
February 9, 2015 - Began sealing the shell to the frame.
February 8, 2015 - Shell cleanup and tail light assembly removal.

2014
May 31, 2014 - Vent covers and television antenna removed.
May 30, 2014 - Air conditioner removal.
May 27, 2014 - Clearance issues...
May 26, 2014 - Secured the shell structure to the frame.
May 25, 2014 - Mating the shell to the frame...continued.
May 24, 2014 - Mating the shell to the frame...continued.
May 19, 2014 - Mating the shell to the frame...continued.
May 18, 2014 - Began mating the shell to the frame.
May 6, 2014 - Tongue jack reinstalled.
May 4, 2014 - Frame turned over and back on the wheels.
April 27, 2014 - Frame safety chain mounting brackets and new safety chains installed.
April 20, 2014 - Frame safety chains and tongue jack stabilizer removed.
April 6, 2014 - Belly skin seams sealed.
March 30, 2014 - Frame closeouts sealed.
March 23, 2014 - Fabricated and installed the aft frame closeouts.
March 22, 2014 - Curbside corner damage repair; fabricated sewer hose storage closeout.
March 18, 2014 - Curbside corner damage.
February 23, 2014 - Finished fabricating tongue closeouts.
February 9, 2014 - Began fabricating tongue closeouts.
January 26, 2014 - Fabricated the step closeout.
January 25, 2014 - Belly skin fabrication completed.
January 20, 2014 - Belly skin fabrication, continued...
January 19, 2014 - Subfloor insulation completed; continued belly skin fabrication.
January 18, 2014 - Final center belly skin fasteners installed; more subfloor insulation.
January 1, 2014 - Gray water tank covers completed.

2013
December 31, 2013 - More tank cover work.
December 30, 2013 - More belly skin and tank cover work.
December 1, 2013 - Additional work on the 6 gallon tank cover.
November 10, 2013 - Rivets installed in tank covers. Rivnut installation illustrated.
November 3, 2013 - Completed fabricating the tank covers.
November 2, 2013 - Began fabricating a cover for the 9 and 18 gallon tanks.
September 29, 2013 - Skinned the undercarriage above the axles.
September 28, 2013 - Skinned the undercarriage just aft of the wheel wells.
September 27, 2013 - More work on the undercarriage...
September 26, 2013 - More work on the undercarriage...
September 22, 2013 - Aft belly skin section fabrication completed.
September 17, 2013 - Aft belly skin section fabrication continued...
September 15, 2013 - Aft belly skin section fabrication.
September 14, 2013 - Subfloor insulation.
September 10, 2013 - Fun and adventure at Tulsa Auto Spring.
September 2, 2013 - Fabricated 6 gallon tank cover closeouts and template for next section.
September 1, 2013 - Began gray tank cover fabrication.
August 29, 2013 - Wired the tank level sending unit for the gray tanks.
August 24, 2013 - Original belly skins pulled from storage.
August 18, 2013 - Wheel wells sealed; bathroom drain secured to cross members.
August 15, 2013 - Removed a leaf spring to be used in fabricating a new spring set.
March 30, 2013 - Frame inverted.
March 24, 2013 - Preparing to invert the frame.
March 16, 2013 - "C" channel installation completed.
February 26, 2013 - Installed front center "C" channel section.
February 24, 2013 - Installed front "C" channel corner sections.
February 3, 2013 - Fabricated remaining "C" channel corner sections.
February 2, 2013 - Installed gray, black tank level sending units; began work on "C" channel.
January 27, 2013 - Finished securing subfloor to frame.
January 24, 2013 - Acquired new "C" channel; acquired pop rivets for belly skin install.
January 20, 2013 - Gray and black water drain system functional check.
January 19, 2013 - Subfloor secured to the frame.
January 12, 2013 - New scare light acquired; brake wiring installed.

2012
December 31, 2012 - New marker light assemblies acquired.
December 9, 2012 - Removed filler neck from aluminum fresh water pressure tank.
December 8, 2012 - New tail light lenses acquired.
November 25, 2012 - Drain valve flashing part 2; installed sewer hose carrier; installed step.
November 24, 2012 - Painted the sewer hose carrier.
November 23, 2012 - More paint on the step; stripped paint off of the sewer hose carrier.
November 13, 2012 - Sewer hose carrier cleanup.
November 4, 2012 - Subfloor sections spliced together and placed on frame.
November 3, 2012 - Finished sealing the top of subfloor section 1.
October 31, 2012 - Picked up aluminum for belly and interior.
October 30, 2012 - Finished sealing the bottom of subfloor section 1.
October 29, 2012 - Began sealing subfloor section 1. Brake wiring acquired.
October 28, 2012 - Subfloor section 4 sealed; bathroom sink drain connected to gray tank.
October 27, 2012 - Subfloor sealing continued...
October 24, 2012 - Entry handle and emblems picked up from the chrome shop.
October 23, 2012 - Subfloor sealing continued. Tested corrugated fastener installation.
October 22, 2012 - First fasteners installed in subfloor.
October 21, 2012 - Subfloor sealing continued - three of five sections completed.
October 20, 2012 - Subfloor sealing continued; began installing drain pipes.
October 15, 2012 - Subfloor sealing continued...
October 14, 2012 - Gray tanks installed; wheel well alignment verified; began sealing subfloor.
October 1, 2012 - Fabricated new subfloor shield/drain valve box roof.
September 30, 2012 - Fitting of the subfloor completed.
September 29, 2012 - Subfloor work continued...
September 24, 2012 - Began work on the new subfloor.
September 20, 2012 - Entry handle and emblems delivered to the chrome shop.
September 15, 2012 - Picked up marine plywood for subfloor.
September 10, 2012 - Wheel well painting completed.
September 9, 2012 - Finished painting the frame; started on wheel wells and step.
September 3, 2012 - First coat of paint applied to the frame.
September 2, 2012 - Frame cleaned and etched.
August 26, 2012 - Frame prep complete. Tongue jack reconfigured.
August 19, 2012 - Began frame prep for paint.
August 14, 2012 - 9 gal tank slide stops added; bathroom sink drain pipe rests added.
August 13, 2012 - Weld cleanup on the gray water tank supports.
August 12, 2012 - Gray water tank support welds completed.
July 28, 2012 - Reinforcements welded to the cross member.
July 26, 2012 - Cross member and tank support reinforcement.
June 17, 2012 - Below floor plumbing layout completed.
June 10, 2012 - Finished fitting installation; leak checked tanks.
June 9, 2012 - 9 gallon tank fittings installed; 18 gallon tank prep.
June 6, 2012 - Began welding fittings to 9 gallon tank.
June 3, 2012 - Tank vent and drains located.
June 2, 2012 - Tank straps drilled and bolted in place.
March 25, 2012 - Gray tank installation continued...
March 24, 2012 - Gray tank installation continued...
March 17, 2012 - Gray tank installation continued...
February 5, 2012 - Gray tank installation continued...
January 22, 2012 - Gray tank installation continued...
January 15, 2012 - Began gray tank installation

2011
November 26, 2011 - Valterra valves and fittings, Ronco Plastics tanks received
September 24, 2011 - Propane tank rack and battery box support removed
September 18, 2011 - New axles installed
September 16, 2011 - Picked up new axles; cast aluminum emblems received
September 11, 2011 - Springs and equalizers painted; skin polish test
August 30, 2011 - Back from the axle supplier...
August 28, 2011 - Axles removed for repair/replacement
July 10, 2011 - Outrigger closeouts welded in place
July 4, 2011 - Last cross member replaced; step support completed
July 3, 2011 - Frame work continued...
July 2, 2011 - Frame work continued...
July 1, 2011 - Frame work continued...
June 27, 2011 - Frame work continued...
June 26, 2011 - Frame work continued...
June 19, 2011 - Frame work continued...
June 13, 2011 - Frame work continued...
June 12, 2011 - Frame work continued...
June 11, 2011 - Frame work continued...
May 30, 2011 - More frame work...
May 29, 2011 - Two more short cross members welded to frame
May 28, 2011 - First cross member welded to frame
May 22, 2011 - New Silver Streak and Sabre emblems; new back-up lights
April 17, 2011 - Black water tank completed; top and fittings installed
March 27, 2011 - Welded the black water tank trough bottom
March 25, 2011 - New cross members received; tank fittings arrived; tank trough walls welded
March 20, 2011 - Frame cross members removed for local fabrication
March 13, 2011 - Began black water tank trough fabrication
March 12, 2011 - Final frame cleanup/prep for media blasting
March 6, 2011 - Remaining subfloor sections removed from frame
March 5, 2011 - Welding completed on top half of black water tank
February 27, 2011 - Practiced welding HDPE for black water tank fabrication
February 20, 2011 - Two forward subfloor sections removed
February 19, 2011 - Subfloor "C" channel removed
February 13, 2011 - Thetford black water tank dimensioned
February 6, 2011 - Center belly skin section removed
January 30, 2011 - Subfloor to outrigger and "C" channel measurements
January 29, 2011 - Aft belly skin removed from frame

2010
December 19, 2010 - Forward belly skin removed from frame
December 12, 2010 - Frame moved from under shell for first time; carpet and tile removal
December 5, 2010 - Shell removal finalized; shell on sawhorses
December 4, 2010 - Shell raised off of frame
December 3, 2010 - More preparation for shell removal
November 28, 2010 - Preparation for shell removal
November 27, 2010 - Two aft interior skins, interior wheel wells, insulation and trunk removal
November 26, 2010 - Interior prep continued; Roadside mid-skin and front corner skin removal
November 22, 2010 - Interior prep continued; Entry door and interior skin removal
November 19, 2010 - Interior prep continued; lower interior skin removal
November 15, 2010 - More interior prep; electrical fixtures, backsplash and converter
November 13, 2010 - Curb-side aft lower gold trim removal; wood trunk floor removal
November 12, 2010 - Interior gold window trim removal
November 7, 2010 - General interior cleanup; examining shell and belly skin attachment
November 6, 2010 - Copper water pipe and LP gas black pipe removal
November 5, 2010 - Gaucho and front dinette overhead cabinet removal
October 31, 2010 - Fresh water tank, bathroom overhead cabinet, and shower removal
October 30, 2010 - Kitchen counter, cabinet and closet removal
October 25, 2010 - Vanity removal
October 24, 2010 - Black water tank and drain valve removal
October 22, 2010 - Water heater removal
October 21, 2010 - Closet removal
October 20, 2010 - Refrigerator and associated cabinet removal
October 18, 2010 - Bed frame removal
October 17, 2010 - Gaucho bed and dinette removal
October 16, 2010 - Heater and stove removal
October 10, 2010 - Evaluation day
October 2, 2010 - Out of the weather
September 29, 2010 - Delivery day

1970 Silver Streak Sabre