Subfloor insulation completed; continued belly skin fabrication.

---------------------------------------------------

We installed the remaining subfloor insulation.

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

The next belly skin section is fabricated.

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

That's all for today.