Subfloor secured to the frame.

---------------------------------------------------

The weather was great today. A 65 degree day in January is a real treat.

I managed to get almost all of the subfloor secured to the frame today. We are a few fasteners short at the front of the frame, so we'll have to get more fasteners on order.

Chalk lines are used to outline the cross members and frame rails on the top surface of the subfloor. All holes are pre-drilled before the fasteners are installed.

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

That's all for today.