More frame work today........
---------------------------------------------------
The roadside frame rail at this location suffered from years of exposure to a leaking waste tank. Pitting and deep scale cover a 2" x 4" area of the web. The area was cleaned up and a 3/16" thick scab patch was added to this area.
The cross member was fitted and the upper flanges were welded. Time was limited this afternoon, so the webs will have to be welded the next free evening I have.
That's all for today.