Installed a trailer jack on the A frame. Installed "C" channel bolts. Drain holes drilled in "C" channel.
---------------------------------------------------
I will be inverting the frame soon to make it easier to insulate and install the belly skin. There are a few open items to complete before the frame can ve inverted, so I spent the afternoon working on these items.
Installed a trailer jack at the front of the frame. Two more will be installed at the aft end of the frame at a later date. The jacks will permit the frame to be moved around while in the inverted position.
There are five bolts that attach the "C" channel/subfloor to the frame; three are located at the front, two are located at the back. The original carriage bolts are replaced with 18-8 stainless bolts.
There are drain/vent holes in the "C" channel/subfloor. I used the old "C" channel to locate and drill these holes in the new subfloor.
1" holes are drilled in the "C" channel/subfloor for the wiring for the 12 volt electrical system and external trailer lighting.
That's all for today.