Fabricated another subfloor shield/drain valve box roof; installed sewer hose carrier; installed step.
---------------------------------------------------
I decided to remake the drain valve box roof flashing out of anodized aluminum to match original. Reference October 1, 2012 log entry for original fabrication effort.
Installed the sewer hose carrier.
Installed the step with stainless hardware.
That's all for today.