I spent the afternoon prepping the frame to be media blasted.
---------------------------------------------------
The old LP regulator and tank mount hardware are removed.
The old breakaway switch is removed.
Trailer brake wiring is removed.
The spare tire carrier bracket is welded to the bumper. The welds are ground off and the bracket removed.
The old load leveling and sway control brackets were welding to the curb side tongue. The welds are ground off and the brackets removed.
Finally, the drain pipes are removed.
Finished up the afternoon removing broken subfloor fasteners and belly skin pop rivet tails that remained in the frame. The frame is now ready to be taken to the media blasters for clean-up.
That's all for today.