Aft belly skin section fabrication completed.
---------------------------------------------------
We finished attaching the aft skin to the "C" channel. We learned a lot while attaching the road side aft corner, so the curb side turned out much better.
We attached the straight sections before tackling the corner.
We then segmented the entire radius of the corner.
The segments are folded over the "C" channel, working one at a time from back to front.
The corner is completed without a flaw.
The aft straight section is next...
The skin is folded over the "C" channel in 8" segments, starting at the center, and folding segments alternating left and right until the entire section is completed.
Aft section completed...
We're really pleased with the way the curb side corner turned out...much better than the road side.
That's all for today.