Subfloor section 4 sealed; bathroom sink drain connected to tank.
---------------------------------------------------
It was warm enough this evening to get the final two coats of epoxy on subfloor section 4.
Connected the bathroom sink drain to the gray tank.
I need to start thinking of where to mount a SeeLevel tank sensor on the gray tank.
That's all for today.