The new axles are installed today.

---------------------------------------------------

I started the day by installing the bushings in the equalizers and springs.

1970 Silver Streak Sabre

The bushings are chamfered for ease of installation in the equalizers.

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

The springs were loosely installed on the axles.

1970 Silver Streak Sabre

And slid into place under the frame...

1970 Silver Streak Sabre

The equalizers and shackles are installed...

1970 Silver Streak Sabre

....and the springs are attached to the shackles and spring hangers.  All hardware is tightened at this point.

1970 Silver Streak Sabre

1970 Silver Streak Sabre

Installation complete.  I will retorque all fasteners when this project is near completion and axles assemblies are fully loaded.

The old wheels are installed.  The frame is now mobile.

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

That's all for today.