Two more short cross members were welded in place today, and the first long cross member was cut from the frame.

---------------------------------------------------

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

Two 1" x 1" x 3/16" angles support the waste tank location.

1970 Silver Streak Sabre

Most of the web of the roadside end of the cross member was removed for the waste tank dump.  2" x 3/16" flats were added to the upper and lower flanges for support.

1970 Silver Streak Sabre

2" x 2" x 3/16" x 6" angles are welded to the bottom of the main frame rail.  This is were the stabilizers would be placed.  The angles are in rough shape and were removed.

1970 Silver Streak Sabre

1970 Silver Streak Sabre

1970 Silver Streak Sabre

That's all for today.